Stage 01 of 08
01 — Quarry & Raw Material

Limestone

Extraction of the primary raw material that becomes cement — quarried and transported to the plant for crushing.

~1.5t of raw material per tonne of cement
02 — Primary & Secondary Crushing

Crusher

Reducing quarried limestone to a manageable size, ready for grinding into raw meal.

Reduced to under 25mm
Stage 02 of 08
Stage 03 of 08
03 — Vertical Roller Mill

Raw Mill

Grinding raw materials into a fine raw meal, ready to feed the kiln system.

Ground to raw meal fineness
04 — Preheating & Calcination

Preheater

Raw meal is preheated across cyclone stages before entering the kiln, recovering heat from the process.

Preheated to ~900°C
Preheater at a Raden-supported cement plant, glowing at sunrise
Rotary Kiln at a Raden-supported cement plant, glowing at sunrise
05 — Clinker Formation

Rotary Kiln

Raw meal is fired into clinker at extreme temperature — the heart of the manufacturing process.

Fired at ~1450°C
06 — Cooling & Handling

Clinker Cooler

Rapid cooling locks in clinker quality and recovers heat before storage.

Rapidly air-cooled
Clinker Cooler at a Raden-supported cement plant, glowing at sunrise
Stage 07 of 08
07 — Vertical Roller Mill

Cement Mill

Grinding clinker and gypsum together into the finished cement product.

Clinker + gypsum, finely ground
08 — Bagging & Dispatch

Packing Plant

Bagging, bulk loading, and dispatch of finished cement to the customer.

Bagged & bulk dispatch
Stage 08 of 08